Policy Highlight :
Energy storage target: DISCOMs must procure storage capacity equivalent to at least 10% of their demand by FY 2035–36.
Renewable charging: At least 85% of stored energy annually must come from renewable sources.
Co-located BESS: Targets 10 GW of new renewable energy projects with storage by FY 2029–30 and 25 GW by FY 2035–36.
Storage duration: Co-located storage must equal at least 50% of renewable capacity, with a minimum two-hour duration by FY 2029–30 and four hours for projects from FY 2030–31 onward.
Industrial storage: Encourages BESS for industrial consumers, green open access and integration with existing power plants.
Abstract:
The policy aims to accelerate renewable energy deployment and energy storage to ensure affordable, reliable and sustainable electricity. The policy targets meeting 65% of the state’s electricity demand through renewable energy by FY 2035–36. It identifies Battery Energy Storage Systems (BESS) and pumped storage projects as critical for integrating variable solar and wind power, improving grid stability and optimising electricity utilisation. Distribution companies are required to procure energy storage capacity equivalent to at least 10% of their demand by FY 2035–36, subject to the condition that at least 85% of the stored energy procured annually comes from renewable sources. The policy promotes standalone storage projects, storage co-located with renewable energy, distributed storage, urban and industrial solar-plus-storage hubs, and the integration of renewable energy and storage with thermal power stations. It also provides for transmission connectivity, government and private land access, and exemptions from specified transmission, distribution and electricity-related charges for eligible storage projects. These measures aim to strengthen grid flexibility, encourage private investment and support Maharashtra’s long-term clean energy transition