Policy Highlight :
Competitive procurement: BESS services must primarily be procured through competitive bidding under Section 63 of the Electricity Act, 2003.
Minimum project size: Generally, BESS projects must exceed 1 MW, provide at least two hours of storage and connect at 11 kV or above, subject to specified exceptions.
Renewable energy integration: Promotes BESS deployment to manage renewable energy intermittency and improve grid flexibility, stability and reliability.
SLDC control: The State Load Despatch Centre can issue overriding dispatch instructions to grid-connected BESS during grid disturbances to protect grid security.
Abstract:
The Gujarat Electricity Regulatory Commission (Grid Interactive Battery Energy Storage System) Regulations, 2026 establish a comprehensive regulatory framework for the planning, procurement, development, deployment, operation, scheduling, dispatch and utilisation of grid-interactive Battery Energy Storage Systems (BESS) across Gujarat. Notified by the Gujarat Electricity Regulatory Commission (GERC) on 16 October 2026, the regulations aim to enhance power system flexibility, reliability, stability and security while facilitating the efficient integration of renewable energy and addressing its intermittency. They define the roles and responsibilities of generating companies, transmission and distribution licensees, independent storage developers, consumers, prosumers and aggregators. The framework provides for multiple BESS deployment models, including generation-linked, transmission-linked, distribution-linked, standalone systems, consumer-level storage and integration with electric vehicle charging and battery-swapping infrastructure. It establishes provisions for competitive bidding, commercial arrangements, energy accounting, scheduling, dispatch, ancillary services and participation in electricity markets. The regulations also address multi-use applications, revenue recovery, grid management, technical standards, cybersecurity, safety and battery end-of-life disposal.