Abstract:
The tender document issued by Integral Coach Factory (ICF), Chennai, under the Ministry of Railways, invites bids for the installation of a grid-connected Battery Energy Storage System (BESS) to provide reliable power backup and support energy management at its Design and Development building. The project involves a 2 MW power system with 4 MWh storage capacity, based on lithium iron phosphate (LiFePOâ‚„) battery technology. The turnkey scope includes design, engineering, supply, installation, testing, commissioning and integration with the existing 11 kV electrical network. The system will incorporate battery and energy management systems, power conversion equipment, remote monitoring, cooling and fire protection mechanisms. It is intended to support peak-load management, energy storage and reliable power supply to the facility. The contractor must ensure system safety, operational performance, grid compatibility and compliance with applicable technical standards. The contract also provides for a five-year warranty followed by five years of comprehensive operation and maintenance.