Logo 2
Energy Storage in India
Back / Previous

Sort Results

Narrow Your Search

Request for Proposal (Rfp) for Selection of Consultant for Carrying out the Study of the Technical Feasibility and Commercial Viability of Setting up Battery Energy Storage System (Bess) in the State of Kerala.
Request for Proposal (Rfp) for Selection of Consultant for Carrying out the Study of the Technical Feasibility and Commercial Viability of Setting up Battery Energy Storage System (Bess) in the State of Kerala.

2026

Kerala State Electricity Board

Kerala State Electricity Board (KSEB) has invited tenders for the selection of a consultant to assess the technical feasibility and commercial viability of Battery Energy Storage S...

POWERGRID Invites Bids For 250 MW/1000 MWh Battery Energy Storage Project In West Bengal
POWERGRID Invites Bids For 250 MW/1000 MWh Battery Energy Storage Project In West Bengal

2026

POWERGRID

Power Grid Corporation of India Limited (POWERGRID) has invited open bids for a major battery energy storage project in West Bengal as part of India’s growing efforts to strengthen...

Request for Selection (Rfs) Document for Selection of Solar Power Developers for Setting Up of 3000 MW Solar PV Power Projects with 1000 MW/ 6000 MWH Energy Storage Systems (ESS) in India under Tariff-Based Competitive Bidding
Request for Selection (Rfs) Document for Selection of Solar Power Developers for Setting Up of 3000 MW Solar PV Power Projects with 1000 MW/ 6000 MWH Energy Storage Systems (ESS) in India under Tariff-Based Competitive Bidding

TGREDCO has invited bids for developing 3,000 MW of solar power capacity integrated with battery energy storage systems (BESS) to enhance renewable energy integration, grid flexibi...

Provision of Battery Energy Storage System (BESS) for Power Back up for Climatic Chamber
Provision of Battery Energy Storage System (BESS) for Power Back up for Climatic Chamber

The project involves a 2 MW power system with 4 MWh storage capacity, based on lithium iron phosphate (LiFePO₄) battery technology.

Package TS-BESS-01 for Setting up of 187.5 MW
Package TS-BESS-01 for Setting up of 187.5 MW

Package TS-BESS-01 for Setting up of 187.5 MW / 750 MWH (187.5 MW x 4 Hrs) Battery Energy Storage System(BESS) in Telangana associated with Setting up of 187.5 MW / 750 MWH (187.5...